Baia Bodrum Hotel
Hotel

Baia Bodrum Hotel

Location Bodrum
Year 2026
Area 25,000 m²
Operations Continued
Project Summary

What was needed?

At Baia Bodrum Hotel, we carried out design work, technical control and coordination with the fire department under the Turkish Fire Protection Regulation.

The Situation

Operational realities

The existing buildings and systems at Baia Bodrum Hotel needed to be brought into compliance with the current Turkish Fire Protection Regulation.

Our Approach

How we managed it

We assessed the hotel's architectural and technical structure against fire safety criteria and prepared designs in line with the regulation. Throughout the process, the works progressed under control with the continuity of hotel operations in mind.

Process Management

Site coordination

Design and site control were carried out in parallel, in coordination with the relevant departments.
The required arrangements were completed in line with meetings and technical assessments with the fire authority.
Outcome

Delivered without interrupting operations

The fire safety infrastructure of Baia Bodrum Hotel was brought into compliance with the Turkish Fire Protection Regulation, and the process coordinated with the fire department was completed successfully, raising the safety level of the facility and achieving full regulatory compliance.